The Parish Council is proposing to upgrade the building to ensure energy efficiency, increased capacity and accessibility:
-
By installing installing energy efficiency measures, the building will be a more pleasant place to work and visit.
-
Improved access from the car park alongside an accessible counter will ensure equality for all.
-
Additional consultation and storage space within the current foot print, will enable the Medical Practice to increase the opening hours and therefore the number of appointment slots available.
​
CONSULTATION NOW CLOSED
Page left open for information only.
​
![Outside looking at.jpg](https://static.wixstatic.com/media/d48f8b_4494ecdc27004dd081c5aca592ff80d2~mv2.jpg/v1/fill/w_520,h_285,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Outside%20looking%20at.jpg)
Increased capacity:
-
Finish 1st floor to allow for additional rooms and storage:
-
Flooring
-
Plasterboard and mist cost of paint.
-
Electrics and first fit plumbing
-
-
Install new staircase and fire door
-
Relocate cleaners cupboard
-
Install hot/cold air conditioning to allow improved temperature control in all rooms.
Accessibility:
-
Clear shrubs at the front (centre of photo of building).
-
Install 2m x 3.5m path.
-
Install accessible counter to dispensary
-
Remove benches and replace with appropriate seating.
-
Replace all carpets with washable safety flooring.
-
Redocrate throughout once works complete.
![Waiting area 2.jpg](https://static.wixstatic.com/media/d48f8b_cb40fb0df2d14e7cb9203adfc3f29862~mv2.jpg/v1/fill/w_448,h_298,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Waiting%20area%202.jpg)
![energy-efficiency-g2c15a5c5c_1280.png](https://static.wixstatic.com/media/d48f8b_9aae0fe892b8436a8e51c99d3e7b52c3~mv2.png/v1/fill/w_478,h_326,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/energy-efficiency-g2c15a5c5c_1280.png)
Energy efficiency:
-
Replace all windows with white UPVC double glazed units (including FENSA registration).
-
Wire and fit LED battens and/or bulkhead lights in all rooms.
-
Install Solar PV panels and battery.
-
Ensure insulation throughout the building is to current specifications.
Funding:
The estimated cost of the works is £120,000.
A health related CIL bid for £90,000 will be made shortly.
​
A contribution of up to 25% of the costs from other sources will be required, this would equal £30,000 – the Parish Council could use Neighbourhood CIL to fund this.
Should a CIL bid be unsuccessful, then an application for a Public Works Loan may be submitted.
The exact cost of the loan is uncertain given the current economic climate, however an estimate of the cost is:
​
£90,000 loan to be repaid over 10 years (remaining term of current lease) estimated cost £11,300 per annum (as at 1st October).
​
The cost of the loan will be paid from the rent.
A rent review has recently taken place and the revised rent as calculated by the District Valuer is £22,400 per annum.
​
![Flexible Payment Planning](https://static.wixstatic.com/media/599cfc36e9e64341811ef890e64f1c32.jpg/v1/fill/w_87,h_51,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/Flexible%20Payment%20Planning.jpg)